Deutsch
Türkçe
English
REAL ESTATE INVESTMENT

Hotel Clup Rose Bay, Turkey

SHORT DESCRIPTION

This property is located at Yenifoça Bay in Turkey. The hotel property extends to 40,000 sqm and features a 200-metre beach for the guests in its 503 rooms, 198 in the external building and 305 in the main building. Premium materials were used for the entire project. Construction took 18 months.

Altin Yunus, Turkey

SHORT DESCRIPTION

This hotel in the tourist town of Cesme extends over 30,000 sqm. The 237-room property has been built with premium construction materials. Construction took a total of 24 months.

 

 

Astana Hz. Sultan Mosque, Kazakhstan

SHORT DESCRIPTION

This 17,000 sqm mosque provides space for 8,000 people. Ten domes reach a height of 52 metres and four minarets stand 77 metres tall. This architectural beauty comprises social facilities, prayer rooms, several libraries, a wedding hall, archive rooms, lodgings, commercial premises, a restaurant seating 400 guests, a VIP lounge and sanitary rooms.

Main train station Izmir Basmane, Turkey

SHORT DESCRIPTION

This train station was originally built by a French company in 1876, completed in the same year as its twin station in Lyon, France. The middle part of the building is the main station hall with brickwork spanning three floors. The exterior façade had been constructed of natural stones. 

In 1922, this building was severely damaged by a large fire in Basmane (Izmir). After the formation of TCDD, the refurbishment commenced in 1926, and construction work was taken up in 2006. Following a complex structural restoration and refurbishment, the station was reopened in 2009.

 

Toki projects Malatya, Turkey

SHORT DESCRIPTION

A total of 927 residential units across 23,000 sqm of living space were built in the town of Malatya in the Turkish province of Yesiljurt. Premium materials were used for the entire project. Construction took a total of 36 months.

Shopping centre, fashion store Ege Park Izmir, Turkey

SHORT DESCRIPTION

The shopping centre, built on an 18,000-square-metre plot, opened its doors on 20th November 1999. It comprises a total of 44,000 square metres of usable floor space. Construction took 24 months.

Ilica hotel Cesme, Turkey

SHORT DESCRIPTION

This hotel in the tourist town of Cesme extends over 30,000 sqm. The 237-room property has been built with premium construction materials. Construction took a total of 24 months.

Carthage airport, Tunisia

SHORT DESCRIPTION

The airport property extends to 4,300 hectares. The first construction phase saw the erection of the main building on 90,000 square metres. The total terminal area is 130,000 square metres, and provides for 18 aircraft. Measuring 14 airplane length, the landing strip is 3,300 metres long and 75 metres wide.

 

Technical University of Ege, Turkey

SHORT DESCRIPTION

The university building was erected in Izmir in the province of Bornova. The project received a lot of voluntary support and progressed quickly.